GH Phipps built a digital model to analyze the underground utility work common to building 2 and 3. The model allowed improved communication and coordination of revised utility line elevations, building foundation, and site retaining walls. Separate models were utilized for site logistics and phasing study and 4D construction schedule simulation. |